IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0638 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,787 $0 Not Implemented
UD0638 # 03 Y:2002 03 2002 MAKE A NEW BY-PRODUCT $49,743 $30,000 Implemented
UD0638 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,000 $17,017 Implemented
UD0638 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $75,000 $10,000 Implemented
UD0638 # 04 Y:2002 04 2002 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $18,300 $4,175 Not Implemented
UD0638 # 05 Y:2002 05 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,572 $21,682 Not Implemented
UD0638 # 06 Y:2002 06 2002 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,079 $18,900 Not Implemented
UD0638 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,144 $6,458 Implemented
UD0638 # 09 Y:2002 09 2002 OPTIMIZE PLANT POWER FACTOR $1,935 $1,800 Not Implemented
UD0638 # 10 Y:2002 10 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,751 $0 Implemented
UD0638 # 11 Y:2002 11 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,211 $250 Implemented
UD0638 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128 $101 Implemented
UD0451 # 01 Y:1995 01 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $11,837 $2,000 Implemented
UD0451 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,100 $0 Implemented
UD0451 # 03 Y:1995 03 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,981 $4,440 Not Implemented
UD0451 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,000 $26,000 Not Implemented
WV0003 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66 $36 Not Implemented
WV0003 # 08 Y:1993 08 1993 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $4,966 $1,790 Not Implemented
WV0003 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,698 $2,000 Not Implemented
WV0003 # 06 Y:1993 06 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,126 $2,100 Not Implemented
WV0003 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $598 Not Implemented
WV0003 # 02 Y:1993 02 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $720 $905 Not Implemented
WV0003 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $473 $290 Not Implemented
WV0003 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,675 $10,000 Not Implemented
UD0223 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $809 $100 Implemented