Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 364 | Electric Lighting And Wiring Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0638 # 07 Y:2002 | 07 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,787 | $0 | Not Implemented |
UD0638 # 03 Y:2002 | 03 | 2002 | MAKE A NEW BY-PRODUCT | $49,743 | $30,000 | Implemented |
UD0638 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,000 | $17,017 | Implemented |
UD0638 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $75,000 | $10,000 | Implemented |
UD0638 # 04 Y:2002 | 04 | 2002 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $18,300 | $4,175 | Not Implemented |
UD0638 # 05 Y:2002 | 05 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $9,572 | $21,682 | Not Implemented |
UD0638 # 06 Y:2002 | 06 | 2002 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,079 | $18,900 | Not Implemented |
UD0638 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,144 | $6,458 | Implemented |
UD0638 # 09 Y:2002 | 09 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $1,800 | Not Implemented |
UD0638 # 10 Y:2002 | 10 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,751 | $0 | Implemented |
UD0638 # 11 Y:2002 | 11 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,211 | $250 | Implemented |
UD0638 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $128 | $101 | Implemented |
UD0451 # 01 Y:1995 | 01 | 1995 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $11,837 | $2,000 | Implemented |
UD0451 # 02 Y:1995 | 02 | 1995 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,100 | $0 | Implemented |
UD0451 # 03 Y:1995 | 03 | 1995 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,981 | $4,440 | Not Implemented |
UD0451 # 04 Y:1995 | 04 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,000 | $26,000 | Not Implemented |
WV0003 # 05 Y:1993 | 05 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $66 | $36 | Not Implemented |
WV0003 # 08 Y:1993 | 08 | 1993 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $4,966 | $1,790 | Not Implemented |
WV0003 # 07 Y:1993 | 07 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,698 | $2,000 | Not Implemented |
WV0003 # 06 Y:1993 | 06 | 1993 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $20,126 | $2,100 | Not Implemented |
WV0003 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,893 | $598 | Not Implemented |
WV0003 # 02 Y:1993 | 02 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $720 | $905 | Not Implemented |
WV0003 # 03 Y:1993 | 03 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $473 | $290 | Not Implemented |
WV0003 # 04 Y:1993 | 04 | 1993 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,675 | $10,000 | Not Implemented |
UD0223 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $809 | $100 | Implemented |