IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0457 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,805 $11,000 Not Implemented
WI0457 # 04 Y:2003 04 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,413 $0 Not Implemented
WI0457 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $936 $200 Not Implemented
WI0457 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $740 Not Implemented
WI0457 # 02 Y:2003 02 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,965 $800 Not Implemented
WI0457 # 03 Y:2003 03 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $3,333 $8,000 Not Implemented
AM0447 # 02 Y:2003 02 2003 AIR CONDITION ONLY SPACE NECESSARY $9,640 $190 Implemented
AM0447 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $17,500 $22,850 n/a
AM0447 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,150 $200 Implemented
AM0447 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $830 Implemented
AM0447 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $320 $100 Not Implemented
AM0447 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,655 $560 Implemented
LM0055 # 05 Y:2003 05 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $2,902 $5,187 Not Implemented
LM0055 # 08 Y:2003 08 2003 DEVELOP STANDARD OPERATING PROCEDURES $277,680 $6,344 Not Implemented
LM0055 # 07 Y:2003 07 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $215,000 $20,000 Implemented
LM0055 # 06 Y:2003 06 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,900 $2,572 Not Implemented
LM0055 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,231 $1,300 Implemented
LM0055 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,209 $27,572 Implemented
LM0055 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $26,748 $10,240 Not Implemented
LM0055 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,172 $120 Implemented
AS0348 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,361 $16,680 Implemented
AS0348 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $164 $101 Implemented
AS0348 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $93,399 $45,312 Not Implemented
AS0348 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $413 $2,000 Implemented
AS0348 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,021 $450 Implemented