IAC logo
IAC Assessment: AS0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Sheet metal work, electromechanical assembly, turnkey contract manufactu
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 84,000
Annual Production 500,000 Pieces
Production Hrs. Annual 2,404
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,258 817,549 kWh $0.05
Electricity Demand $16,146 4,009 kW-months/year $4.03
Electricity Fees $6,902 - $ -
TOTAL ENERGY COSTS $65,802
RECOMMENDED SAVINGS* $108,358 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,959
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$164
Cost:
$101
$159 3,027 $5 1 - - $159
3,027
kWh
$5
1
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,361
Cost:
$16,680
$1,454 26,394 $1,907 410 - - $1,454
26,394
kWh
$1,907
410
kW-months/year
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,000
Cost:
$15,500
$3,251 58,898 $749 162 - - $3,251
58,898
kWh
$749
162
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,021
Cost:
$450
$4,875 90,123 $2,146 450 - - $4,875
90,123
kWh
$2,146
450
kW-months/year
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$413
Cost:
$2,000
$311 5,743 $102 24 - - $311
5,743
kWh
$102
24
kW-months/year
-
-
$
06: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$93,399
Cost:
$45,312
- - - - $93,399 - -
-
kWh
-
-
kW-months/year
$93,399
-
$
TOTAL RECOMMENDED Savings:
$108,358
Cost:
$80,043
$10,050 184,185 $4,909 1,047 $93,399 - $10,050
184,185
kWh
$4,909
1,047
kW-months/year
$93,399
-
$
TOTAL IMPLEMENTED Savings:
$10,959
Cost:
$19,231
$6,799 125,287 $4,160 885 - - $6,799
125,287
kWh
$4,160
885
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $