Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
462
matching recommendationsSIC | 366 | Communications Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0003 # 03 Y:1991 | 03 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $10,979 | $10,470 | Implemented |
HO0003 # 04 Y:1991 | 04 | 1991 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $2,140 | $3,036 | Implemented |
HO0003 # 05 Y:1991 | 05 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $6,280 | $0 | Implemented |
HO0003 # 06 Y:1991 | 06 | 1991 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $779 | $0 | Implemented |
HO0003 # 07 Y:1991 | 07 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $457 | $1,500 | Implemented |
GT0425 # 01 Y:1990 | 01 | 1990 | INSTALL SET-BACK TIMERS | $230 | $630 | Not Implemented |
GT0425 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,461 | $49,722 | Implemented |
GT0425 # 03 Y:1990 | 03 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,080 | $34,000 | Implemented |
GT0425 # 04 Y:1990 | 04 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $568 | $302 | Implemented |
GT0425 # 05 Y:1990 | 05 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,068 | $0 | Implemented |
GT0425 # 06 Y:1990 | 06 | 1990 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $110,936 | $250,000 | Not Implemented |
GT0425 # 07 Y:1990 | 07 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,240 | $10,200 | Not Implemented |
RU0102 # 01 Y:1990 | 01 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $504 | $0 | Not Implemented |
RU0102 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,462 | $631 | Implemented |
RU0102 # 03 Y:1990 | 03 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,881 | $2,500 | Implemented |
RU0102 # 04 Y:1990 | 04 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $632 | $302 | Implemented |
RU0102 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,466 | $0 | Implemented |
RU0102 # 06 Y:1990 | 06 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $917 | $0 | Not Implemented |
RU0102 # 07 Y:1990 | 07 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $9,330 | $34,669 | Not Implemented |
WI0038 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,820 | $0 | Not Implemented |
WI0038 # 02 Y:1988 | 02 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $606 | $700 | Not Implemented |
WI0038 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $953 | $1,000 | Implemented |
WI0038 # 04 Y:1988 | 04 | 1988 | INSULATE BARE EQUIPMENT | $174 | $500 | Not Implemented |
WI0038 # 05 Y:1988 | 05 | 1988 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,340 | $1,400 | Not Implemented |
AT0098 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,381 | $13,055 | Implemented |