IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
SIC 3663 Radio & Tv Communications Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0030 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $13,656 $74,715 Not Implemented
UF0030 # 03 Y:1992 03 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,025 $12,100 Not Implemented
UF0030 # 04 Y:1992 04 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,415 $4,269 Not Implemented
GT0425 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $230 $630 Not Implemented
GT0425 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,461 $49,722 Implemented
GT0425 # 03 Y:1990 03 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,080 $34,000 Implemented
GT0425 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $568 $302 Implemented
GT0425 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,068 $0 Implemented
GT0425 # 06 Y:1990 06 1990 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $110,936 $250,000 Not Implemented
GT0425 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,240 $10,200 Not Implemented
AT0098 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,381 $13,055 Implemented
AT0098 # 02 Y:1988 02 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $2,433 $500 Implemented
AT0098 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $486 $900 Implemented
RU0021 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,128 $370 Implemented
RU0021 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $302 $0 Implemented
RU0021 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $109 $0 Not Implemented
RU0021 # 04 Y:1988 04 1988 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $956 $800 Implemented
RU0021 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,480 $2,151 Not Implemented
RU0021 # 06 Y:1988 06 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,095 $400 Implemented
UD0040 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,038 $760 Not Implemented
UD0040 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $176 $300 Implemented
UD0040 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $424 $0 Implemented
UD0040 # 04 Y:1982 04 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $363 $24 Not Implemented