IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 3663 Radio & Tv Communications Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0301 # 11 Y:2016 11 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $540 $280 Implemented
MI0301 # 10 Y:2016 10 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $580 $3,880 Not Implemented
MI0301 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,252 $2,200 Implemented
MI0301 # 08 Y:2016 08 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,288 $8,881 Implemented
MI0301 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $2,146 Not Implemented
MI0301 # 01 Y:2016 01 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,850 $1,120 Not Implemented
MI0301 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,990 $35,099 Implemented
MI0301 # 03 Y:2016 03 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,246 $2,379 Not Implemented
MI0301 # 04 Y:2016 04 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,075 $18,626 Not Implemented
MI0301 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $322 Not Implemented
MI0301 # 06 Y:2016 06 2016 USE OPTIMUM THICKNESS INSULATION $2,946 $2,710 Not Implemented
MI0203 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,265 $2,500 Implemented
MI0203 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,157 $50 Implemented
MI0203 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,489 $5,225 Implemented
MI0203 # 03 Y:2011 03 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,406 $12,400 Not Implemented
MI0203 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $16,812 $34,688 Implemented
MI0203 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,006 $1,320 Implemented
UF0272 # 09 Y:2001 09 2001 MAKE A NEW BY-PRODUCT $20,000 $32,250 Not Implemented
UF0272 # 08 Y:2001 08 2001 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $614 $1,500 Not Implemented
UF0272 # 07 Y:2001 07 2001 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $416 $1,895 Not Implemented
UF0272 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $1,179 $416 Not Implemented
UF0272 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $9,635 $50 Implemented
UF0272 # 04 Y:2001 04 2001 KEEP EQUIPMENT CLEAN $9,330 $12,500 Not Implemented
UF0272 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $9,845 $42,000 Not Implemented
UF0272 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,175 $525 Not Implemented