IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,411

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0004 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,087 $500 Implemented
RU0004 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,692 $2,800 Implemented
RU0004 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $6,567 $2,800 Implemented
AM0001 # 04 Y:1987 04 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $544 $354 Implemented
CO0090 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $381 $200 Implemented
CO0090 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $528 $350 Implemented
CO0090 # 04 Y:1987 04 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $689 $1,200 Implemented
CO0090 # 05 Y:1987 05 1987 AIR CONDITION ONLY SPACE NECESSARY $556 $100 Implemented
CO0090 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $375 $500 Implemented
CO0090 # 07 Y:1987 07 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,133 $2,000 Implemented
CO0090 # 08 Y:1987 08 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,147 $1,350 Implemented
CO0090 # 09 Y:1987 09 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $65 $90 Implemented
CO0090 # 10 Y:1987 10 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $1,000 Implemented
KU0220 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,362 $3,200 Implemented
KU0220 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $0 Implemented
KU0220 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $10 Implemented
AT0044 # 01 Y:1986 01 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,139 $3,000 Implemented
AT0044 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,956 $300 Implemented
AT0044 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $1,800 Implemented
KU0179 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $500 Implemented
KU0179 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,450 Implemented
KU0179 # 05 Y:1985 05 1985 COVER OPEN TANKS $279 $60 Implemented
KU0179 # 06 Y:1985 06 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $174 $0 Implemented
ST0043 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $100 Implemented
ST0043 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $0 Implemented