IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1071 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,382 $61,013 Implemented
OK0991 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,462 $17,053 Implemented
OK0991 # 04 Y:2018 04 2018 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,577 $1,015 Implemented
OK0991 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $536 Implemented
OK0991 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $724 $0 Implemented
OK0963 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,937 $38,220 Implemented
OK0963 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $0 Implemented
OK0963 # 06 Y:2017 06 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,116 $1,182 Implemented
KU0179 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $500 Implemented
KU0179 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,450 Implemented
KU0179 # 05 Y:1985 05 1985 COVER OPEN TANKS $279 $60 Implemented
KU0179 # 06 Y:1985 06 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $174 $0 Implemented
KU0160 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,445 $10,000 Implemented
KU0160 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,982 $900 Implemented
KU0160 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,662 $2,000 Implemented