IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0283 # 05 Y:1993 05 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $590 $250 Implemented
CO0283 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $150 Implemented
SF0009 # 01 Y:1993 01 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,671 $1,500 Not Implemented
SF0009 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $2,947 Not Implemented
SF0009 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $235 Not Implemented
SF0009 # 04 Y:1993 04 1993 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,790 $1,200 Not Implemented
SF0009 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $880 $694 Not Implemented
AS0096 # 01 Y:1993 01 1993 ADD AREA LIGHTING SWITCHES $1,219 $2,012 Implemented
AS0096 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,441 $0 Implemented
AS0096 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $369 $497 Not Implemented
AS0096 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $628 $0 Not Implemented
AS0096 # 05 Y:1993 05 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,006 $7,200 Implemented
AS0096 # 06 Y:1993 06 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,455 $9,000 Not Implemented
AS0096 # 07 Y:1993 07 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $516 $200 Not Implemented
AS0096 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $909 $500 Implemented
AS0096 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $792 $150 Not Implemented
AS0096 # 10 Y:1993 10 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,451 $4,000 Not Implemented
AS0096 # 11 Y:1993 11 1993 ISOLATE HOT OR COLD EQUIPMENT $1,577 $300 Implemented
AS0096 # 12 Y:1993 12 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $178 $100 Implemented
UD0405 # 01 Y:1993 01 1993 UPGRADE CONTROLS ON COMPRESSORS $2,213 $100 Implemented
UD0405 # 02 Y:1993 02 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,743 $2,000 Implemented
UD0405 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,176 $2,511 Implemented
UD0405 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $548 $1,000 Implemented
MA0274 # 01 Y:1993 01 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $9,079 $2,733 Not Implemented
MA0274 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,949 $125 Not Implemented