IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0137 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $588 $200 Not Implemented
MA0137 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $56 Not Implemented
WI0042 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $5,488 $0 Not Implemented
WI0042 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $0 Implemented
WI0042 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,829 $309 Not Implemented
WI0042 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,254 $1,650 Not Implemented
WI0042 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $356 $500 Not Implemented
WI0042 # 06 Y:1988 06 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $446 $0 Implemented
WI0042 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,012 $250 Implemented
CO0107 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $161 $200 Implemented
CO0107 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $226 $2,000 Implemented
CO0107 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,136 $700 Implemented
CO0107 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,463 $1,200 Not Implemented
CO0107 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,111 $1,150 Implemented
CO0107 # 06 Y:1987 06 1987 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,215 $250 Implemented
CO0107 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $921 $318 Implemented
MA0100 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,258 $2,050 Implemented
MA0100 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,571 $19,480 Not Implemented
MA0100 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $200 Implemented
OR0006 # 01 Y:1987 01 1987 INSTALL SET-BACK TIMERS $451 $0 Not Implemented
OR0006 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,009 $8,000 Implemented
OR0006 # 03 Y:1987 03 1987 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $8,718 $1,000 Implemented
OR0006 # 04 Y:1987 04 1987 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,130 $7,000 Not Implemented
OR0006 # 05 Y:1987 05 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $718 $200 Implemented
OR0006 # 06 Y:1987 06 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,143 $600 Implemented