IAC Assessment: AS0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product ELECTROLYTIC FOIL
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 13,000,000 Pounds
Production Hrs. Annual 8,250
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,197,633 82,888,630 kWh $0.05
TOTAL ENERGY COSTS $4,197,633
RECOMMENDED SAVINGS* $483,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$420,880
Cost:
-
$762,816 15,066,823 $(-341,936) (-106,522) $762,816
15,066,823
kWh
$(-341,936)
(-106,522)
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,702
Cost:
$2,000
$5,173 102,286 $(-1,471) (-327) $5,173
102,286
kWh
$(-1,471)
(-327)
MMBtu
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$9,652
Cost:
$36,000
$9,652 281,653 - - $9,652
281,653
kWh
-
-
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$14,804
Cost:
$18,000
$14,804 292,497 - - $14,804
292,497
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,073
Cost:
$12,775
$6,073 119,871 - - $6,073
119,871
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,852
Cost:
$2,168
$1,852 36,635 - - $1,852
36,635
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,293
Cost:
-
$2,293 45,428 - - $2,293
45,428
kWh
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,724
Cost:
$500
$6,724 132,767 - - $6,724
132,767
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,160
Cost:
$1,000
$1,160 22,860 - - $1,160
22,860
kWh
-
-
MMBtu
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$16,171
Cost:
-
$16,171 319,461 - - $16,171
319,461
kWh
-
-
MMBtu
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$193
Cost:
-
$193 3,810 - - $193
3,810
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$483,504
Cost:
$72,443
$826,911 16,424,091 $(-343,407) (-106,849) $826,911
16,424,091
kWh
$(-343,407)
(-106,849)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas