IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0039 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,511 $263 Not Implemented
DL0039 # 03 Y:2009 03 2009 ADD AREA LIGHTING SWITCHES $5,647 $3,600 Not Implemented
DL0039 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,047 $0 Implemented
DL0039 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,500 $4,700 Not Implemented
LE0228 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,503 $100 Implemented
LE0228 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,856 $43,904 Not Implemented
LE0228 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $750 Not Implemented
LE0228 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $1,700 Implemented
LE0228 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,427 $2,500 Implemented
LE0228 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $3,963 $1,250 Implemented
LE0228 # 02 Y:2006 02 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,308 $620 Implemented
LE0228 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,075 $41,200 Not Implemented
RU0126 # 05 Y:1991 05 1991 ISOLATE HOT OR COLD EQUIPMENT $2,183 $3,500 Implemented
RU0126 # 04 Y:1991 04 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,736 $3,372 Implemented
RU0126 # 03 Y:1991 03 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,998 $5,000 Implemented
RU0126 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $717 Implemented
RU0126 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,503 $0 Implemented
RU0004 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $6,567 $2,800 Implemented
RU0004 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $1,965 $400 Not Implemented
RU0004 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,692 $2,800 Implemented
RU0004 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,087 $500 Implemented
ST0043 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,145 $292 Not Implemented
ST0043 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $100 Implemented
ST0043 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $0 Implemented
ST0043 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $423 $0 Implemented