IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0368 # 03 Y:2013 03 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $15,354 $800 Not Implemented
LE0368 # 02 Y:2013 02 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,077 $800 Not Implemented
LE0368 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,192 $1,280 Not Implemented
LE0368 # 13 Y:2013 13 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,829 $2,000 Not Implemented
LE0368 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,200 $1,000 Not Implemented
LE0368 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $4,569 $4,320 Not Implemented
LE0368 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $618 $500 Not Implemented
LE0368 # 08 Y:2013 08 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $688 $1,200 Not Implemented
LE0368 # 09 Y:2013 09 2013 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,354 $0 Not Implemented
LE0368 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,761 $61,150 Not Implemented
LE0368 # 11 Y:2013 11 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,665 $16,200 Not Implemented
LE0368 # 12 Y:2013 12 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,154 $64,400 Not Implemented
LE0328 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,369 $15,675 Implemented
LE0328 # 06 Y:2011 06 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,743 $3,000 Not Implemented
LE0328 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,383 $2,500 Implemented
LE0328 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $2,714 $540 Not Implemented
LE0328 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,853 $18,000 Implemented
LE0328 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,435 $12,420 Implemented
LE0328 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,447 $60,000 Not Implemented
LE0328 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,650 $3,000 Implemented
LE0330 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,277 $1,600 Not Implemented
LE0330 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $67,588 $491,000 Not Implemented
LE0330 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $10,060 $600 Implemented
LE0254 # 07 Y:2007 07 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,029 $800 Not Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented