IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0574 # 05 Y:2024 05 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $649 $152 n/a
AS0574 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,317 $2,384 n/a
AS0574 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,135 $501 n/a
AS0574 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,540 $1,389 n/a
AS0574 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $29,273 $271,736 n/a
AM0907 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,560 $5,000 n/a
AM0907 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,120 $358,027 n/a
AM0907 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $1,950 $5,135 n/a
AM0907 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $625 $240 n/a
AM0907 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $8,350 n/a
AS0569 # 07 Y:2023 07 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $229 $86 Not Implemented
AS0569 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $146 Implemented
AS0569 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $5,151 Not Implemented
AS0569 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,945 $490 Not Implemented
AS0569 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $5,717 $3,715 Implemented
AS0569 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,444 $7,395 Not Implemented
AS0569 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,436 $18,656 Implemented
LE0557 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,250 $37,000 n/a
LE0557 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,463 $29,000 n/a
LE0557 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $291,977 $600,000 n/a
LE0557 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197,906 $323,780 n/a
LE0557 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,783 $9,500 n/a
LE0557 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,494 $100 n/a
LE0557 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $279,544 $0 n/a
LE0557 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $87,150 $3,000 n/a