IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0405 # 04 Y:1993 04 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $548 $1,000 Implemented
UD0402 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,502 $0 Implemented
UD0402 # 02 Y:1993 02 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,564 $0 Not Implemented
UD0402 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,064 $0 Implemented
UD0402 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $4,680 $1,500 Implemented
UD0402 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,502 $25,812 Implemented
UD0402 # 06 Y:1993 06 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,782 $15,000 Implemented
UD0402 # 07 Y:1993 07 1993 INSTALL TIMERS AND/OR THERMOSTATS $2,295 $1,350 Implemented
UD0343 # 01 Y:1991 01 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $801 $100 Not Implemented
UD0343 # 02 Y:1991 02 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,695 $0 Not Implemented
UD0343 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,735 $0 Not Implemented
UD0343 # 04 Y:1991 04 1991 INSTALL STORM WINDOWS AND DOORS $1,587 $1,100 Not Implemented
UD0343 # 05 Y:1991 05 1991 MINIMIZE WATER USAGE $2,314 $0 Not Implemented
UD0283 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,105 $2,000 Implemented
UD0283 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,833 $3,000 Implemented
UD0283 # 03 Y:1989 03 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $738 $0 Implemented
UD0283 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $602 $400 Implemented
UD0086 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $480 Implemented
UD0086 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,175 $3,300 Implemented
UD0086 # 03 Y:1983 03 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $204 $0 Implemented
UD0086 # 04 Y:1983 04 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $30 Implemented
UD0037 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $379 Not Implemented
UD0037 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $350 $0 Not Implemented
UD0037 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,116 $300 Not Implemented
UD0037 # 04 Y:1982 04 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,573 $3,500 Implemented