IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 3672 Printed Circuit Boards
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0168 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
MI0168 # 08 Y:2008 08 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $22,202 $3,320 Implemented
MI0168 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $256,906 $645,000 Not Implemented
MI0168 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $60,893 $2,040 Implemented
MI0168 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,290 $43,681 Implemented
MI0168 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,060 $1,210 Implemented
MI0168 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $40 Implemented
MI0166 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $360,093 $695,000 Not Implemented
MI0166 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,996 $1,200 Implemented
MI0166 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,899 $41,800 Implemented
MI0166 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,060 $1,210 Implemented
MI0166 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $40 Implemented
MI0166 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
UF0132 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,399 $40,610 Not Implemented
UF0132 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,768 $350 Implemented
UF0132 # 06 Y:1995 06 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,950 $15,000 Not Implemented
UF0132 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $3,802 $0 Not Implemented
UF0132 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,055 $1,094 Implemented
UF0132 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $4,087 $192 Not Implemented
UF0132 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,637 $32,604 Implemented
UF0121 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,196 $850 Implemented
UF0121 # 07 Y:1995 07 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,903 $3,716 Implemented
UF0121 # 06 Y:1995 06 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $39,531 $14,650 Implemented
UF0121 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $731 $1,160 Not Implemented
UF0121 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $3,323 $532 Not Implemented