Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
608
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0528 # 01 Y:2003 | 01 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,940 | $4,360 | Implemented |
CO0528 # 02 Y:2003 | 02 | 2003 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $13,340 | $14,640 | Not Implemented |
CO0528 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,850 | $16,010 | Not Implemented |
CO0528 # 04 Y:2003 | 04 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,000 | $3,000 | Not Implemented |
CO0528 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,720 | $13,150 | Not Implemented |
CO0528 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,940 | $10,310 | Not Implemented |
TA0059 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,950 | $0 | Not Implemented |
TA0059 # 02 Y:2003 | 02 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,536 | $500 | Not Implemented |
TA0059 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,885 | $7,671 | Implemented |
TA0059 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,890 | $200 | Implemented |
TA0059 # 05 Y:2003 | 05 | 2003 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,100 | $585 | Not Implemented |
TA0059 # 06 Y:2003 | 06 | 2003 | REPAIR FAULTY LOUVERS AND DAMPERS | $2,040 | $625 | Not Implemented |
AS0347 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,462 | $0 | Implemented |
AS0347 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,330 | $8,920 | Implemented |
AS0347 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,837 | $60 | Implemented |
AS0347 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,657 | $18,000 | Not Implemented |
AS0347 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $3,155 | $14 | Not Implemented |
AS0347 # 06 Y:2003 | 06 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $720 | $40 | Implemented |
AS0347 # 07 Y:2003 | 07 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $27,104 | $6,400 | Not Implemented |
AS0347 # 08 Y:2003 | 08 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $64,137 | $800 | Not Implemented |
AS0347 # 09 Y:2003 | 09 | 2003 | CLEAR AND RENT EXISTING SPACE | $15,165 | $11,220 | n/a |
MI0050 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $173,081 | $82,800 | Not Implemented |
MI0050 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $95,397 | $66,000 | Not Implemented |
MI0050 # 03 Y:2002 | 03 | 2002 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $53,360 | $5,000 | Not Implemented |
MI0050 # 04 Y:2002 | 04 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $10,046 | $21,150 | Not Implemented |