Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0557 # 08 Y:2024 | 08 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,250 | $37,000 | n/a |
LE0557 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,463 | $29,000 | n/a |
LE0557 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $291,977 | $600,000 | n/a |
LE0557 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $279,544 | $0 | n/a |
LE0557 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $87,150 | $3,000 | n/a |
LE0557 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,494 | $100 | n/a |
LE0557 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,783 | $9,500 | n/a |
LE0557 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197,906 | $323,780 | n/a |
WV0592 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,832 | $4,720 | Not Implemented |
WV0592 # 14 Y:2020 | 14 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $47 | $250 | Not Implemented |
WV0592 # 06 Y:2020 | 06 | 2020 | INSTALL SET-BACK TIMERS | $1,823 | $222 | Implemented |
WV0592 # 07 Y:2020 | 07 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,361 | $3,757 | Not Implemented |
WV0592 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $3,240 | Implemented |
WV0592 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $829 | $3,850 | Not Implemented |
WV0592 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $723 | $1,312 | Implemented |
WV0592 # 11 Y:2020 | 11 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $397 | $36 | Implemented |
WV0592 # 12 Y:2020 | 12 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $372 | $303 | Implemented |
WV0592 # 13 Y:2020 | 13 | 2020 | INSULATE BARE EQUIPMENT | $157 | $742 | Implemented |
WV0592 # 04 Y:2020 | 04 | 2020 | MINIMIZE WATER USAGE | $3,145 | $2,100 | Implemented |
WV0592 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,217 | $9,054 | Implemented |
WV0592 # 02 Y:2020 | 02 | 2020 | RECYCLE WHITE WATER | $6,078 | $6,252 | Not Implemented |
WV0592 # 01 Y:2020 | 01 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,201 | $9,500 | Implemented |
LE0254 # 07 Y:2007 | 07 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,029 | $800 | Not Implemented |
LE0254 # 06 Y:2007 | 06 | 2007 | OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE | $5,988 | $3,000 | Implemented |
LE0254 # 05 Y:2007 | 05 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,471 | $800 | Not Implemented |