IAC Assessment: LE0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2007
Principal Product Semi Conductor Device Wafers
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $100,000,000-$500,000,000
# of Employees 287
Plant Area (Sq.Ft.) 500,000
Annual Production 152,000 Pieces
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,638,227 59,369,700 kWh $0.03
Electricity Demand $626,261 98,330 kW-months/year $6.37
Natural Gas $1,120,233 179,182 MMBtu $6.25
TOTAL ENERGY COSTS $3,384,721
RECOMMENDED SAVINGS* $181,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,674
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$81,900
Cost:
$65,000
- - - - $81,900 13,104 -
-
kWh
-
-
kW-months/year
$81,900
13,104
MMBtu
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$67,570
Cost:
$67,000
$51,668 1,845,309 $15,902 2,496 - - $51,668
1,845,309
kWh
$15,902
2,496
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,157
Cost:
$20,000
$6,215 221,958 $1,942 305 - - $6,215
221,958
kWh
$1,942
305
kW-months/year
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,686
Cost:
$20,000
- - - - $7,686 1,230 -
-
kWh
-
-
kW-months/year
$7,686
1,230
MMBtu
05: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$7,471
Cost:
$800
$5,713 204,019 $1,758 276 - - $5,713
204,019
kWh
$1,758
276
kW-months/year
-
-
MMBtu
06: 2.6226 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE Savings:
$5,988
Cost:
$3,000
$4,562 162,926 $1,426 224 - - $4,562
162,926
kWh
$1,426
224
kW-months/year
-
-
MMBtu
07: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$3,029
Cost:
$800
$2,316 82,716 $713 112 - - $2,316
82,716
kWh
$713
112
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$181,801
Cost:
$176,600
$70,474 2,516,928 $21,741 3,413 $89,586 14,334 $70,474
2,516,928
kWh
$21,741
3,413
kW-months/year
$89,586
14,334
MMBtu
TOTAL IMPLEMENTED Savings:
$13,674
Cost:
$23,000
$4,562 162,926 $1,426 224 $7,686 1,230 $4,562
162,926
kWh
$1,426
224
kW-months/year
$7,686
1,230
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas