IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3675 Electronic Capacitors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0412 # 09 Y:2016 09 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $119 $576 Not Implemented
SU0412 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,742 $6,797 Not Implemented
SU0412 # 07 Y:2016 07 2016 ELIMINATE/REDUCE AN OPERATION $5,577 $9,195 Not Implemented
SU0412 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $1,707 Not Implemented
SU0412 # 05 Y:2016 05 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,474 $3,632 Not Implemented
SU0412 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $98 $78 Not Implemented
SU0412 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $296 $169 Not Implemented
SU0412 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,342 $480 Not Implemented
SU0412 # 01 Y:2016 01 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $154 $0 Not Implemented
SU0219 # 12 Y:2005 12 2005 ADD AREA LIGHTING SWITCHES $4,267 $10,645 Implemented
SU0219 # 13 Y:2005 13 2005 OPTIMIZE PLANT POWER FACTOR $2,894 $17,500 Not Implemented
SU0219 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,621 $0 Implemented
SU0219 # 11 Y:2005 11 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $53,360 $111,859 Not Implemented
SU0219 # 10 Y:2005 10 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $276 $509 Not Implemented
SU0219 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $1,262 Not Implemented
SU0219 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,137 $1,726 Not Implemented
SU0219 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $6,107 $5,363 Implemented
SU0219 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,969 $38,400 Not Implemented
SU0219 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,948 $721 Implemented
SU0219 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,286 $502 Implemented
SU0219 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,356 $0 Implemented
SU0219 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,400 $0 Not Implemented