IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3677 Electronic Coils And Transformers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0464 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $114 $40 Implemented
LE0464 # 03 Y:2018 03 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,836 $28,000 Implemented
LE0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,809 $23,000 Implemented
LE0464 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,187 $12,000 Implemented
LE0464 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $214 $40 Implemented
SU0250 # 14 Y:2007 14 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,281 $6,030 Not Implemented
SU0250 # 13 Y:2007 13 2007 INSTALL OCCUPANCY SENSORS $157 $321 Implemented
SU0250 # 12 Y:2007 12 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $498 $530 Not Implemented
SU0250 # 11 Y:2007 11 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $36 Implemented
SU0250 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $727 $519 Implemented
SU0250 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,604 $3,502 Implemented
SU0250 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,717 $348 Not Implemented
SU0250 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,133 $587 Implemented
SU0250 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,593 $191 Not Implemented
SU0250 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,654 $425 Implemented
SU0250 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $82 $0 Implemented
SU0250 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Implemented
SU0250 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $696 $0 Implemented
SU0250 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $12,666 $0 Not Implemented