IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0142 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,261 $13,535 Not Implemented
UF0142 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,518 $0 Not Implemented
UF0142 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $72,393 $42,350 Implemented
UF0142 # 04 Y:1996 04 1996 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $4,570 $7,000 Not Implemented
UF0142 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,011 $500 Implemented
UF0124 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,140 $5,883 Implemented
UF0124 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,076 $4,354 Implemented
UF0124 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,637 $350 Implemented
UF0124 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $222 $700 Implemented
UF0124 # 05 Y:1995 05 1995 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,043 $0 Implemented
UF0124 # 06 Y:1995 06 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $413 $950 Not Implemented
UF0124 # 07 Y:1995 07 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,913 $100,000 Not Implemented
UF0124 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,700 $0 Implemented
UF0124 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,157 $5,000 Not Implemented
UF0119 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,375 $3,338 Implemented
UF0119 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,924 $84,732 Implemented
UF0119 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,579 $1,457 Implemented
UF0119 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,827 $350 Implemented
UF0119 # 05 Y:1995 05 1995 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $20,739 $18,879 Not Implemented
UF0119 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $3,078 $2,752 Not Implemented
UF0047 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $846 Implemented
UF0047 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $1,876 Implemented
UF0047 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $170 Not Implemented
UF0047 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $230 $842 Implemented
UF0047 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $184 $200 Not Implemented