Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0043 # 10 Y:1985 | 10 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $4,293 | $420 | Implemented |
ST0043 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $112 | $100 | Implemented |
ST0043 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,145 | $292 | Not Implemented |
ST0043 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $0 | Implemented |
ST0043 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $423 | $0 | Implemented |
ST0043 # 05 Y:1985 | 05 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $431 | $234 | Not Implemented |
ST0043 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $649 | $1,570 | Not Implemented |
ST0043 # 07 Y:1985 | 07 | 1985 | IMPROVE LUBRICATION PRACTICES | $1,193 | $0 | Not Implemented |
ST0043 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $18,809 | $4,989 | Not Implemented |
ST0043 # 09 Y:1985 | 09 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $357 | $33 | Implemented |
CO0035 # 01 Y:1985 | 01 | 1985 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $3,550 | $50 | Implemented |
CO0035 # 02 Y:1985 | 02 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,285 | $2,000 | Implemented |
CO0035 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $100 | $20 | Implemented |
CO0035 # 04 Y:1985 | 04 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,959 | $4,000 | Implemented |
CO0035 # 05 Y:1985 | 05 | 1985 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,596 | $24 | Implemented |
CO0035 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,229 | $6,000 | Implemented |
CO0035 # 07 Y:1985 | 07 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,638 | $4,302 | Implemented |
CO0018 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $511 | $300 | Implemented |
CO0018 # 09 Y:1985 | 09 | 1985 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $863 | $500 | Not Implemented |
CO0018 # 08 Y:1985 | 08 | 1985 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $246 | $50 | Implemented |
CO0018 # 07 Y:1985 | 07 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $8,891 | $2,400 | Implemented |
CO0018 # 06 Y:1985 | 06 | 1985 | USE OPTIMUM THICKNESS INSULATION | $550 | $210 | Implemented |
CO0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $304 | $51 | Implemented |
CO0018 # 04 Y:1985 | 04 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $54 | $92 | Implemented |
CO0018 # 03 Y:1985 | 03 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $17,952 | $100 | Implemented |