IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0043 # 10 Y:1985 10 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,293 $420 Implemented
ST0043 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $100 Implemented
ST0043 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,145 $292 Not Implemented
ST0043 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $0 Implemented
ST0043 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $423 $0 Implemented
ST0043 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $431 $234 Not Implemented
ST0043 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $649 $1,570 Not Implemented
ST0043 # 07 Y:1985 07 1985 IMPROVE LUBRICATION PRACTICES $1,193 $0 Not Implemented
ST0043 # 08 Y:1985 08 1985 INSULATE BARE EQUIPMENT $18,809 $4,989 Not Implemented
ST0043 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $33 Implemented
CO0035 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,550 $50 Implemented
CO0035 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,285 $2,000 Implemented
CO0035 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $20 Implemented
CO0035 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,959 $4,000 Implemented
CO0035 # 05 Y:1985 05 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,596 $24 Implemented
CO0035 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,229 $6,000 Implemented
CO0035 # 07 Y:1985 07 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,638 $4,302 Implemented
CO0018 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $511 $300 Implemented
CO0018 # 09 Y:1985 09 1985 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $863 $500 Not Implemented
CO0018 # 08 Y:1985 08 1985 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $246 $50 Implemented
CO0018 # 07 Y:1985 07 1985 INSTALL TIMERS AND/OR THERMOSTATS $8,891 $2,400 Implemented
CO0018 # 06 Y:1985 06 1985 USE OPTIMUM THICKNESS INSULATION $550 $210 Implemented
CO0018 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $304 $51 Implemented
CO0018 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $54 $92 Implemented
CO0018 # 03 Y:1985 03 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $17,952 $100 Implemented