Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0514 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $188,380 $121,434 Implemented
SD0514 # 02 Y:2015 02 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,024 $1,200 Implemented
SD0514 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,935 $2,000 Implemented
SD0514 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,376 $3,380 Implemented
SD0514 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,336 $400 Not Implemented
BD0453 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,619 $115,000 Not Implemented
BD0453 # 02 Y:2015 02 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,131 $1,000 Implemented
BD0453 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,753 $8,550 Implemented
BD0453 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $3,554 $500 Implemented
BD0453 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $1,020 $500 Not Implemented
BD0453 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $586 $20 Not Implemented
BD0453 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $585 $250 Implemented
BD0453 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $470 Implemented
BD0453 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $349 $375 Implemented
BD0453 # 10 Y:2015 10 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $160 $20 Not Implemented
BD0453 # 11 Y:2015 11 2015 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,040 $6,500 Implemented