Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2015 |
Principal Product | Circuit Boards |
NAICS | 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 4,810 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $107,645 | 2,192,003 | kWh | $0.05 |
Electricity Demand | $20,657 | 4,641 | kW-months/year | $4.45 |
Electricity Fees | $2,399 | - | $ | - |
Natural Gas | $12,385 | 1,594 | MMBtu | $7.77 |
TOTAL ENERGY COSTS | $148,126 | |||
RECOMMENDED SAVINGS* | $40,245 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,860 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $15,619 Cost: $115,000 |
$13,815 | 281,360 | - | - | $1,804 | 237 | - | - | - | - | - | - |
$13,815 281,360 kWh |
- - kW-months/year |
$1,804 237 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $8,131 Cost: $1,000 |
- | - | - | - | $8,131 | 1,068 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,131 1,068 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,753 Cost: $8,550 |
$3,877 | 81,840 | $876 | 204 | - | - | - | - | - | - | - | - |
$3,877 81,840 kWh |
$876 204 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $3,554 Cost: $500 |
$2,674 | 54,470 | $880 | 198 | - | - | - | - | - | - | - | - |
$2,674 54,470 kWh |
$880 198 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,020 Cost: $500 |
$647 | 13,175 | $230 | 52 | - | - | - | - | $90 | - | $53 | - |
$647 13,175 kWh |
$230 52 kW-months/year |
- - MMBtu |
- - lb |
$90 - $ |
$53 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $586 Cost: $20 |
$478 | 9,736 | $108 | 24 | - | - | - | - | - | - | - | - |
$478 9,736 kWh |
$108 24 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $585 Cost: $250 |
$501 | 10,211 | $84 | 19 | - | - | - | - | - | - | - | - |
$501 10,211 kWh |
$84 19 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $447 Cost: $470 |
$229 | 4,660 | $28 | 6 | - | - | - | - | $81 | - | $109 | - |
$229 4,660 kWh |
$28 6 kW-months/year |
- - MMBtu |
- - lb |
$81 - $ |
$109 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $349 Cost: $375 |
$288 | 5,868 | $61 | 14 | - | - | - | - | - | - | - | - |
$288 5,868 kWh |
$61 14 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $160 Cost: $20 |
- | - | $160 | 36 | - | - | - | - | - | - | - | - |
- - kWh |
$160 36 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $5,040 Cost: $6,500 |
- | - | - | - | - | - | $5,040 | 124,800 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,040 124,800 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,245 Cost: $133,185 |
$22,510 | 461,320 | $2,427 | 553 | $9,935 | 1,305 | $5,040 | 124,800 | $171 | - | $162 | - | $22,510 461,320 kWh |
$2,427 553 kW-months/year |
$9,935 1,305 MMBtu |
$5,040 124,800 lb |
$171 - $ |
$162 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,860 Cost: $17,645 |
$7,570 | 157,049 | $1,929 | 441 | $8,131 | 1,068 | $5,040 | 124,800 | $81 | - | $109 | - | $7,570 157,049 kWh |
$1,929 441 kW-months/year |
$8,131 1,068 MMBtu |
$5,040 124,800 lb |
$81 - $ |
$109 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |