IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

989

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0109 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,530 $500 Implemented
WI0109 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,688 $16,237 Implemented
WI0109 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,030 $0 Implemented
WI0109 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,683 $0 Implemented
WI0109 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $13,347 $6,250 Implemented
AM0098 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $51,060 $175,500 Not Implemented
AM0098 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $20,490 $34,000 Implemented
AM0098 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,980 $900 Implemented
AM0098 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $3,100 $115 Implemented
AM0098 # 05 Y:1990 05 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,850 $11,750 Not Implemented
AM0098 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $10,500 Not Implemented
AM0098 # 07 Y:1990 07 1990 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,980 $7,700 Implemented
AM0098 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $970 $137 Implemented
AM0098 # 09 Y:1990 09 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $695 $700 Implemented
AM0098 # 10 Y:1990 10 1990 INSTALL SET-BACK TIMERS $500 $1,180 Not Implemented
AM0098 # 11 Y:1990 11 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $106 $0 Implemented
MA0166 # 01 Y:1989 01 1989 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $19,320 $18,000 Not Implemented
MA0166 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,628 $3,450 Not Implemented
MA0166 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,130 $180 Implemented
MA0166 # 04 Y:1989 04 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $842 $1,700 Not Implemented
MA0166 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $21,230 $7,913 Not Implemented
MA0166 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $908 Not Implemented
KU0294 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $472 Implemented
KU0294 # 02 Y:1989 02 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,418 $15,000 Not Implemented
KU0294 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,667 $8,200 Not Implemented