IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,040

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1904 # 07 Y:2019 07 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,714 $720 n/a
UK1904 # 08 Y:2019 08 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $64,369 $260,000 n/a
UK1904 # 09 Y:2019 09 2019 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $854 $660 n/a
UK1904 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,940 $4,150 n/a
UK1904 # 11 Y:2019 11 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $828 $1,150 n/a
UK1904 # 12 Y:2019 12 2019 DIRECT WARMEST AIR TO COMBUSTION INTAKE $986 $3,960 n/a
UK1904 # 13 Y:2019 13 2019 INSULATE BARE EQUIPMENT $481 $419 n/a
UK1904 # 14 Y:2019 14 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,920 $180,000 n/a
UD0999 # 01 Y:2019 01 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,762 $0 Not Implemented
UD0999 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,453 $0 Implemented
UD0999 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $6,465 $596 Not Implemented
UD0999 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $4,677 $353 Not Implemented
UD0999 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,669 $11,170 Not Implemented
SU0476 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $216 $0 Implemented
SU0476 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,702 $131 Implemented
SU0476 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $3,103 $894 Not Implemented
SU0476 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $803 $433 Implemented
SU0476 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,955 $1,607 Not Implemented
SU0476 # 06 Y:2019 06 2019 ELIMINATE/REDUCE AN OPERATION $5,095 $4,500 Not Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0916 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $5,518 $200 Not Implemented
GT0916 # 03 Y:2018 03 2018 USE OPTIMUM TEMPERATURE $29,211 $1,600 Not Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0916 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $41,023 $3,991 Not Implemented
GT0916 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $12,211 $1,242 Not Implemented