IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
SIC 3692 Primary Batteries, Dry And Wet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0476 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $216 $0 Implemented
SU0476 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $3,103 $894 Not Implemented
SU0476 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,955 $1,607 Not Implemented
SU0476 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $803 $433 Implemented
SU0476 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,702 $131 Implemented
SU0476 # 06 Y:2019 06 2019 ELIMINATE/REDUCE AN OPERATION $5,095 $4,500 Not Implemented
MZ0237 # 03 Y:2017 03 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,548 $0 Not Implemented
MZ0237 # 01 Y:2017 01 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,793 $0 Implemented
MZ0237 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $599 $50 Implemented
MZ0237 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $262 $800 Not Implemented
MZ0237 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,338 $0 Implemented
MZ0237 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $36,123 $11,000 Implemented
MZ0237 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $69 $0 Implemented
MZ0237 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,362 $25,000 Implemented
IP0085 # 01 Y:2017 01 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,359 $0 Not Implemented
IP0085 # 09 Y:2017 09 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $448,362 $2,150,000 Not Implemented
IP0085 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $989 $804 Not Implemented
IP0085 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $18,232 $10,662 Not Implemented
IP0085 # 06 Y:2017 06 2017 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,250 $2,002 Not Implemented
IP0085 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,570 $963 Not Implemented
IP0085 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $155 Not Implemented
IP0085 # 03 Y:2017 03 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,004 $4 Not Implemented
IP0085 # 02 Y:2017 02 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,244 $6 Not Implemented
IP0014 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,703 $2,128 Not Implemented
IP0014 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $25,849 $0 Not Implemented