IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
SIC 3699 Electrical Equipment & Supplies, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0526 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,810 $1,340 Not Implemented
GT0526 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,860 $189,480 Not Implemented
GT0526 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,020 $135,100 Not Implemented
GT0526 # 05 Y:1994 05 1994 INSTALL TIMERS AND/OR THERMOSTATS $10,800 $13,300 Not Implemented
GT0526 # 06 Y:1994 06 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,120 $250 Implemented
GT0526 # 07 Y:1994 07 1994 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $189,570 $279,700 Not Implemented
MA0263 # 01 Y:1993 01 1993 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,400 $120 Implemented
MA0263 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $838 $1,562 Implemented
MA0263 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $18 Not Implemented
MA0263 # 04 Y:1993 04 1993 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $557 $720 Not Implemented
MA0263 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $459 $1,800 Not Implemented
MA0263 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $207 $0 Implemented
OK0388 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,461 $1,798 Implemented
OK0388 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,508 $11,034 Implemented
OK0388 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $482 $1,424 Not Implemented
OK0388 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $231 $0 Not Implemented
OK0388 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $297 $0 Implemented
WI0109 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $13,347 $6,250 Implemented
WI0109 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,683 $0 Implemented
WI0109 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,030 $0 Implemented
WI0109 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,688 $16,237 Implemented
WI0109 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,530 $500 Implemented
WI0109 # 06 Y:1991 06 1991 RECOVER WASTE HEAT FROM EQUIPMENT $716 $800 Implemented
WI0109 # 07 Y:1991 07 1991 INSTALL STORM WINDOWS AND DOORS $803 $2,466 Implemented
WI0109 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $700 Implemented