Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
264
matching recommendationsSIC | 3699 | Electrical Equipment & Supplies, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0526 # 02 Y:1994 | 02 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,810 | $1,340 | Not Implemented |
GT0526 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,860 | $189,480 | Not Implemented |
GT0526 # 04 Y:1994 | 04 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $51,020 | $135,100 | Not Implemented |
GT0526 # 05 Y:1994 | 05 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $10,800 | $13,300 | Not Implemented |
GT0526 # 06 Y:1994 | 06 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,120 | $250 | Implemented |
GT0526 # 07 Y:1994 | 07 | 1994 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $189,570 | $279,700 | Not Implemented |
MA0263 # 01 Y:1993 | 01 | 1993 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $2,400 | $120 | Implemented |
MA0263 # 02 Y:1993 | 02 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $838 | $1,562 | Implemented |
MA0263 # 03 Y:1993 | 03 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $741 | $18 | Not Implemented |
MA0263 # 04 Y:1993 | 04 | 1993 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $557 | $720 | Not Implemented |
MA0263 # 05 Y:1993 | 05 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $459 | $1,800 | Not Implemented |
MA0263 # 06 Y:1993 | 06 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $207 | $0 | Implemented |
OK0388 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,461 | $1,798 | Implemented |
OK0388 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,508 | $11,034 | Implemented |
OK0388 # 03 Y:1992 | 03 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $482 | $1,424 | Not Implemented |
OK0388 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $231 | $0 | Not Implemented |
OK0388 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $297 | $0 | Implemented |
WI0109 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $13,347 | $6,250 | Implemented |
WI0109 # 02 Y:1991 | 02 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,683 | $0 | Implemented |
WI0109 # 03 Y:1991 | 03 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,030 | $0 | Implemented |
WI0109 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,688 | $16,237 | Implemented |
WI0109 # 05 Y:1991 | 05 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,530 | $500 | Implemented |
WI0109 # 06 Y:1991 | 06 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $716 | $800 | Implemented |
WI0109 # 07 Y:1991 | 07 | 1991 | INSTALL STORM WINDOWS AND DOORS | $803 | $2,466 | Implemented |
WI0109 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $700 | Implemented |