IAC logo
IAC Assessment: GT0526
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0526
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1994
Principal Product Military Electronic Hardware
NAICS n/a
SIC 3699 - Electrical Equipment & Supplies, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 230,000
Annual Production 1,560 Pieces
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $736,705 13,176,143 kWh $0.06
Natural Gas $175,927 44,382 MMBtu $3.96
TOTAL ENERGY COSTS $912,632
RECOMMENDED SAVINGS* $312,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,780
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,660
Cost:
$25,050
$9,660 172,040 - - $9,660
172,040
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,810
Cost:
$1,340
$3,810 68,288 - - $3,810
68,288
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$42,860
Cost:
$189,480
$42,860 766,706 - - $42,860
766,706
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$51,020
Cost:
$135,100
$51,020 1,318,288 - - $51,020
1,318,288
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,800
Cost:
$13,300
$10,800 507,034 - - $10,800
507,034
kWh
-
-
MMBtu
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,120
Cost:
$250
$5,120 91,442 - - $5,120
91,442
kWh
-
-
MMBtu
07: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$189,570
Cost:
$279,700
$81,460 1,456,624 $108,110 27,300 $81,460
1,456,624
kWh
$108,110
27,300
MMBtu
TOTAL RECOMMENDED Savings:
$312,840
Cost:
$644,220
$204,730 4,380,422 $108,110 27,300 $204,730
4,380,422
kWh
$108,110
27,300
MMBtu
TOTAL IMPLEMENTED Savings:
$14,780
Cost:
$25,300
$14,780 263,482 - - $14,780
263,482
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas