Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
297
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0054 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,936 | $1,803 | Implemented |
AS0054 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15 | $147 | Implemented |
AS0054 # 06 Y:1992 | 06 | 1992 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,062 | $2,400 | Not Implemented |
AS0054 # 07 Y:1992 | 07 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,880 | $100 | Implemented |
AS0045 # 01 Y:1991 | 01 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,635 | $0 | Implemented |
AS0045 # 02 Y:1991 | 02 | 1991 | USE HEAT PUMP FOR SPACE CONDITIONING | $13,446 | $96,100 | Implemented |
AS0045 # 03 Y:1991 | 03 | 1991 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $2,136 | $5,000 | Implemented |
AS0045 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,443 | $850 | Implemented |
AS0045 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,193 | $5,211 | Implemented |
AS0045 # 06 Y:1991 | 06 | 1991 | KEEP LAMPS AND REFLECTORS CLEAN | $4,618 | $6,985 | Implemented |
AS0029 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $669 | $97 | Implemented |
AS0029 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $80 | $198 | Implemented |
AS0029 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $390 | $1,050 | Implemented |
AS0029 # 04 Y:1991 | 04 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40 | $98 | Implemented |
AS0029 # 05 Y:1991 | 05 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $107 | $0 | Implemented |
AS0029 # 06 Y:1991 | 06 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $387 | $1,000 | Implemented |
AS0029 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $1,500 | Implemented |
AS0029 # 08 Y:1991 | 08 | 1991 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $3,631 | $2,200 | Implemented |
AS0022 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $27,958 | $5,100 | Implemented |
AS0022 # 02 Y:1991 | 02 | 1991 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,409 | $30,000 | Implemented |
AS0022 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,189 | $2,775 | Implemented |
AS0022 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,153 | $1,500 | Implemented |
AS0022 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $1,100 | Implemented |
AS0022 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $2,580 | $2,325 | Implemented |
AS0022 # 07 Y:1991 | 07 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,326 | $50,000 | Implemented |