IAC logo
IAC Assessment: AS0022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1991
Principal Product AEROSPACE COMPONENTS
NAICS n/a
SIC 3769 - Space Vehicle Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,210
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $464,412 6,559,496 kWh $0.07
Natural Gas $25,005 5,588 MMBtu $4.47
TOTAL ENERGY COSTS $489,417
RECOMMENDED SAVINGS* $91,218 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $91,218
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$27,958
Cost:
$5,100
$27,958 389,801 $27,958
389,801
kWh
02: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$12,409
Cost:
$30,000
$12,409 186,401 $12,409
186,401
kWh
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,189
Cost:
$2,775
$1,189 16,706 $1,189
16,706
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,153
Cost:
$1,500
$5,153 72,685 $5,153
72,685
kWh
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,472
Cost:
$1,100
$1,472 20,809 $1,472
20,809
kWh
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,580
Cost:
$2,325
$2,580 36,342 $2,580
36,342
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,326
Cost:
$50,000
$1,326 18,757 $1,326
18,757
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$691
Cost:
$550
$691 9,672 $691
9,672
kWh
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$448
Cost:
$515
$448 6,448 $448
6,448
kWh
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$521
Cost:
-
$521 7,327 $521
7,327
kWh
11: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$37,471
Cost:
$100,000
$37,471 - $37,471
-
kWh
TOTAL RECOMMENDED Savings:
$91,218
Cost:
$193,865
$91,218 764,948 $91,218
764,948
kWh
TOTAL IMPLEMENTED Savings:
$91,218
Cost:
$193,865
$91,218 764,948 $91,218
764,948
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage