IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,732

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0244 # 01 Y:2002 01 2002 DEVELOP A REPAIR/REPLACE POLICY $2,879 $2,331 Implemented
NC0244 # 02 Y:2002 02 2002 INSTALL COMMON HEADER ON COMPRESSORS $10,649 $17,871 Not Implemented
NC0244 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,280 $1,350 Not Implemented
NC0244 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,140 $2,000 Not Implemented
NC0244 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $167 $150 Implemented
NC0244 # 06 Y:2002 06 2002 USE SOLAR HEAT TO HEAT WATER $3,554 $8,775 Not Implemented
UM0221 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $40,400 $4,000 Implemented
UM0221 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,486 $7,425 Implemented
UM0221 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,720 $2,000 Not Implemented
UM0221 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $1,250 Implemented
UM0221 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,750 $12,870 Not Implemented
UM0221 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,580 $42,883 Not Implemented
UM0221 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $2,000 Not Implemented
UM0221 # 08 Y:2002 08 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,075 $3,000 Not Implemented
UM0221 # 09 Y:2002 09 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,340 $8,500 Not Implemented
UM0221 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,125 $2,000 Not Implemented
MS0212 # 01 Y:2002 01 2002 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,698 $1,707 Not Implemented
MS0212 # 02 Y:2002 02 2002 USE SYNTHETIC LUBRICANT $1,158 $760 Not Implemented
MS0212 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $982 $477 Implemented
MS0212 # 04 Y:2002 04 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $29,000 $79,245 Implemented
OR0413 # 01 Y:2002 01 2002 EXPAND OPERATIONS INTO UNUSED SPACE $10,000 $1,200 Not Implemented
OR0413 # 02 Y:2002 02 2002 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $214,000 $5,000 Implemented
OR0413 # 03 Y:2002 03 2002 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $142,400 $25,000 n/a
OR0413 # 04 Y:2002 04 2002 MOVE PRODUCT USING MECHANICAL MEANS $3,500 $2,800 Not Implemented
OR0413 # 05 Y:2002 05 2002 MODIFY WORKLOAD $1,250,300 $29,300 n/a