IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,289

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0422 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $332 $110 Implemented
KU0422 # 10 Y:1994 10 1994 RECOVER WASTE HEAT FROM EQUIPMENT $139 $80 Not Implemented
KU0422 # 11 Y:1994 11 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Implemented
NC0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $270 Implemented
NC0019 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,400 $3,500 Not Implemented
NC0019 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $7,853 $0 Not Implemented
NC0019 # 04 Y:1994 04 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,311 $680 Not Implemented
NC0019 # 05 Y:1994 05 1994 REDUCE VENTILATION AIR $17,508 $85,800 Not Implemented
ME0126 # 01 Y:1994 01 1994 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $25,970 $68,000 Not Implemented
ME0126 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $364 $811 Not Implemented
ME0126 # 03 Y:1994 03 1994 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,087 $6,000 Not Implemented
ME0126 # 04 Y:1994 04 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $288 $75 Not Implemented
ME0126 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,030 $50 Not Implemented
ME0126 # 06 Y:1994 06 1994 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $58,800 $120,000 Not Implemented
ME0126 # 07 Y:1994 07 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,080 $15,000 Not Implemented
WV0024 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $498 Implemented
WV0024 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $327 $12,120 Implemented
WV0024 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $400 $368 Not Implemented
WV0024 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $724 $0 Not Implemented
WV0024 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,189 $350 Implemented
WV0024 # 06 Y:1994 06 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,252 $440 Not Implemented
WV0024 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $862 $0 Implemented
OK0426 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,558 $3,224 Implemented
OK0426 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,281 $3,318 Implemented
OK0426 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $999 $900 Implemented