IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,268

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0285 # 11 Y:1993 11 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $860 $400 Not Implemented
CO0285 # 12 Y:1993 12 1993 USE POWER DURING OFF-PEAK PERIODS $660 $120 Not Implemented
CO0285 # 13 Y:1993 13 1993 USE PHOTOCELL CONTROLS $310 $560 Not Implemented
IA0067 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,729 $6,000 Implemented
IA0067 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,274 $510 Not Implemented
IA0067 # 03 Y:1993 03 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,054 $4,750 Implemented
IA0067 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $0 Implemented
AR0008 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,296 $1,589 Not Implemented
AR0008 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,930 $6,240 Not Implemented
AR0008 # 03 Y:1993 03 1993 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,379 $1,000 Not Implemented
AR0008 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,102 $130 Implemented
AR0008 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $885 $100 Not Implemented
KU0405 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,867 $475 Implemented
KU0405 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $242 $200 Not Implemented
KU0405 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $156 $651 Not Implemented
KU0405 # 04 Y:1993 04 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,618 $0 Not Implemented
KU0405 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $354 $520 Not Implemented
KU0405 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $571 $1,800 Not Implemented
KU0405 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93 $340 Not Implemented
KU0405 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
IA0059 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,092 $300 Implemented
IA0059 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,455 $0 Implemented
IA0059 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,568 $27,000 Implemented
IA0059 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,390 $5,850 Implemented
IA0059 # 05 Y:1993 05 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $264 $0 Implemented