IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0097 # 03 Y:1994 03 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $621 $888 Not Implemented
UF0097 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,231 $17,559 Implemented
UF0097 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $873 $3,458 Not Implemented
UF0097 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,478 $1,000 Implemented
UF0097 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,828 $10,000 Not Implemented
UF0097 # 08 Y:1994 08 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $33,331 $101,600 Not Implemented
UF0097 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,666 $9,238 Implemented
MO0123 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,626 $1,295 Implemented
MO0123 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,665 $88,767 Implemented
MO0123 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,145 $515 Implemented
MO0123 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $9,743 $4,240 Not Implemented
MO0123 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,740 $856 Not Implemented
MO0123 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,629 $20,506 Not Implemented
MO0123 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $207 $412 Implemented
MO0123 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,177 $2,885 Not Implemented
MO0123 # 09 Y:1994 09 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $915 $599 Not Implemented
MS0003 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,462 $18,000 Not Implemented
MS0003 # 02 Y:1994 02 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,280 $0 Implemented
MS0003 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,594 $4,000 Not Implemented
MS0003 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,970 $3,740 Implemented
MS0003 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,760 $1,500 Not Implemented
MS0003 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,419 $2,600 Not Implemented
MS0003 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,058 $1,000 Not Implemented
MS0003 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $203 $0 Not Implemented
MS0003 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $161 Implemented