Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1995 |
Principal Product | car caddies and trailors |
NAICS | n/a |
SIC | 3799 - Transportation Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 7,000 Pieces |
Production Hrs. Annual | 5,226 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $122,135 | 2,847,304 | kWh | $0.04 |
Natural Gas | $49,019 | 14,026 | MMBtu | $3.49 |
TOTAL ENERGY COSTS | $180,150 | |||
RECOMMENDED SAVINGS* | $64,617 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,285 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $28,462 Cost: $66,000 |
$54,595 | 1,272,861 | $(-26,133) | (-7,448) | - | - | - | - |
$54,595 1,272,861 kWh |
$(-26,133) (-7,448) MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,093 Cost: $400 |
$3,093 | 72,098 | - | - | - | - | - | - |
$3,093 72,098 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $561 Cost: $25 |
$561 | 13,189 | - | - | - | - | - | - |
$561 13,189 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,771 Cost: $3,555 |
$2,771 | 64,478 | - | - | - | - | - | - |
$2,771 64,478 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,384 Cost: $520 |
$1,384 | 32,239 | - | - | - | - | - | - |
$1,384 32,239 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,382 Cost: $51,892 |
$13,382 | 312,134 | - | - | - | - | - | - |
$13,382 312,134 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $258 Cost: $392 |
- | - | $258 | 74 | - | - | - | - |
- - kWh |
$258 74 MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $11,090 Cost: $7,400 |
- | - | - | - | $11,090 | 208,000 | - | - |
- - kWh |
- - MMBtu |
$11,090 208,000 lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $3,431 Cost: $3,614 |
- | - | - | - | - | - | $3,431 | 16,980 |
- - kWh |
- - MMBtu |
- - lb |
$3,431 16,980 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $185 Cost: $300 |
- | - | - | - | $185 | 16,895 | - | - |
- - kWh |
- - MMBtu |
$185 16,895 lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,617 Cost: $134,098 |
$75,786 | 1,766,999 | $(-25,875) | (-7,374) | $11,275 | 224,895 | $3,431 | 16,980 | $75,786 1,766,999 kWh |
$(-25,875) (-7,374) MMBtu |
$11,275 224,895 lb |
$3,431 16,980 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,285 Cost: $126,084 |
$71,070 | 1,657,093 | $(-25,875) | (-7,374) | $11,090 | 208,000 | - | - | $71,070 1,657,093 kWh |
$(-25,875) (-7,374) MMBtu |
$11,090 208,000 lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) |