IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0388 # 04 Y:1992 04 1992 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $1,078 $59,000 Implemented
KU0388 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,892 $925 Implemented
KU0388 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,155 $630 Implemented
KU0388 # 07 Y:1992 07 1992 USE COMPRESSOR AIR FILTERS $851 $0 Implemented
KU0388 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $182 $480 Implemented
KU0388 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $172 $0 Implemented
KU0388 # 10 Y:1992 10 1992 INSTALL SET-BACK TIMERS $515 $900 Implemented
KU0388 # 11 Y:1992 11 1992 INSTALL SET-BACK TIMERS $281 $91 Not Implemented
AS0068 # 01 Y:1992 01 1992 KEEP LAMPS AND REFLECTORS CLEAN $39,436 $109,150 Not Implemented
AS0068 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,461 $26,270 Not Implemented
AS0068 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,863 $1,536 Not Implemented
AS0068 # 04 Y:1992 04 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,332 $0 Not Implemented
AS0068 # 05 Y:1992 05 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,167 $45,000 Not Implemented
AS0068 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,648 $25,404 Not Implemented
AS0068 # 07 Y:1992 07 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $565 $4,799 Not Implemented
AS0068 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $900 Not Implemented
AM0161 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $630 Implemented
AM0161 # 02 Y:1992 02 1992 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $4,700 $2,255 Not Implemented
AM0161 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,855 $0 Implemented
AM0161 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,290 $985 Implemented
AM0161 # 05 Y:1992 05 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,420 $0 Implemented
AM0161 # 06 Y:1992 06 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,205 $5,050 Not Implemented
AM0161 # 07 Y:1992 07 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $690 $0 Implemented
AM0161 # 08 Y:1992 08 1992 INSTALL TIMERS AND/OR THERMOSTATS $280 $450 Implemented
ND0033 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,764 $7,603 Not Implemented