IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,417

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0063 # 10 Y:1992 10 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101 $253 Not Implemented
WI0152 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,294 $29 Not Implemented
WI0152 # 02 Y:1992 02 1992 RECOVER AND REUSE COOLING WATER $11,189 $15 Implemented
WI0152 # 03 Y:1992 03 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,842 $0 Not Implemented
WI0152 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,429 $0 Not Implemented
WI0152 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,557 $3,000 Implemented
WI0152 # 06 Y:1992 06 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,351 $12,000 Implemented
WI0152 # 07 Y:1992 07 1992 USE RADIANT HEATER FOR SPOT HEATING $9,809 $41,400 Not Implemented
WI0152 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,647 $500 Implemented
WI0152 # 09 Y:1992 09 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,814 $0 Implemented
WI0152 # 10 Y:1992 10 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,153 $1,650 Implemented
WI0152 # 11 Y:1992 11 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,832 $0 Not Implemented
WI0152 # 12 Y:1992 12 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $827 $2,800 Implemented
OK0376 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,222 $3,222 Implemented
OK0376 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $782 Not Implemented
OK0376 # 03 Y:1992 03 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,133 $1,133 Implemented
OK0376 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $777 $777 Implemented
OK0376 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $388 Implemented
OK0376 # 06 Y:1992 06 1992 SHUT OFF PILOTS IN STANDBY EQUIPMENT $388 $561 Not Implemented
OK0376 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $554 Implemented
IA0016 # 01 Y:1992 01 1992 AIR CONDITION ONLY SPACE NECESSARY $38,385 $29,200 Implemented
IA0016 # 02 Y:1992 02 1992 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,600 $30,400 Not Implemented
IA0016 # 03 Y:1992 03 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,252 $4,400 Not Implemented
IA0016 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $116 $120 Not Implemented
IA0016 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,678 $500 Not Implemented