Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1994 |
Principal Product | Aerospace Parts |
NAICS | n/a |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 176 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 110,300 Pieces |
Production Hrs. Annual | 7,320 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $285,070 | 5,990,328 | kWh | $0.05 |
Natural Gas | $12,460 | 3,002 | MMBtu | $4.15 |
TOTAL ENERGY COSTS | $297,530 | |||
RECOMMENDED SAVINGS* | $50,680 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,100 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID |
Savings: $21,300 Cost: $16,000 |
$4,420 | 108,734 | - | - | $16,880 | 3,810 | - | - |
$4,420 108,734 kWh |
- - MMBtu |
$16,880 3,810 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,150 Cost: $34,110 |
$11,150 | 234,174 | - | - | - | - | - | - |
$11,150 234,174 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,820 Cost: $3,430 |
$5,820 | 122,216 | - | - | - | - | - | - |
$5,820 122,216 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED |
Savings: $4,520 Cost: $1,160 |
- | - | - | - | - | - | $4,520 | 5,750 |
- - kWh |
- - MMBtu |
- - gal |
$4,520 5,750 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,280 Cost: $3,260 |
$3,280 | 68,875 | - | - | - | - | - | - |
$3,280 68,875 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,200 Cost: $5,880 |
$3,200 | 67,409 | - | - | - | - | - | - |
$3,200 67,409 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,120 Cost: $920 |
$980 | 20,809 | $140 | 32 | - | - | - | - |
$980 20,809 kWh |
$140 32 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $290 Cost: $530 |
$200 | 7,913 | $90 | 23 | - | - | - | - |
$200 7,913 kWh |
$90 23 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,680 Cost: $65,290 |
$29,050 | 630,130 | $230 | 55 | $16,880 | 3,810 | $4,520 | 5,750 | $29,050 630,130 kWh |
$230 55 MMBtu |
$16,880 3,810 gal |
$4,520 5,750 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,100 Cost: $6,690 |
$9,100 | 191,091 | - | - | - | - | - | - | $9,100 191,091 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) |