Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,504
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0139 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $3,450 | $62 | Implemented |
UD0139 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,083 | $530 | Implemented |
UD0139 # 04 Y:1984 | 04 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,318 | $0 | Implemented |
UD0139 # 05 Y:1984 | 05 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,736 | $15,100 | Implemented |
CO0010 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,635 | $0 | Implemented |
CO0010 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $472 | $500 | Not Implemented |
CO0010 # 03 Y:1984 | 03 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,168 | $6,000 | Not Implemented |
CO0010 # 04 Y:1984 | 04 | 1984 | INSULATE BARE EQUIPMENT | $182 | $68 | Implemented |
CO0010 # 05 Y:1984 | 05 | 1984 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $543 | $493 | Not Implemented |
CO0010 # 06 Y:1984 | 06 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $372 | $800 | Implemented |
CO0010 # 07 Y:1984 | 07 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $165 | $200 | Implemented |
CO0010 # 08 Y:1984 | 08 | 1984 | UPGRADE OBSOLETE EQUIPMENT | $318 | $30 | Implemented |
CO0010 # 09 Y:1984 | 09 | 1984 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $186 | $175 | Implemented |
CO0010 # 10 Y:1984 | 10 | 1984 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $769 | $130 | Implemented |
CO0010 # 11 Y:1984 | 11 | 1984 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,677 | $5,000 | Not Implemented |
GT0227 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $470 | $300 | Not Implemented |
GT0227 # 02 Y:1984 | 02 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,520 | $1,000 | Not Implemented |
GT0227 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,015 | $216 | Implemented |
GT0227 # 04 Y:1984 | 04 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $193 | $10,600 | Implemented |
GT0227 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $850 | $2,858 | Implemented |
GT0227 # 06 Y:1984 | 06 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $720 | $1,400 | Not Implemented |
GT0234 # 01 Y:1984 | 01 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $26,550 | $30,000 | Implemented |
GT0234 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $243 | $386 | Implemented |
GT0234 # 03 Y:1984 | 03 | 1984 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $6,500 | $20,000 | Not Implemented |
KU0133 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,390 | $10,201 | Implemented |