IAC logo
IAC Assessment: KU0270
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0270
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product RECREATIONAL VEHICLES
NAICS n/a
SIC 3716 - Motor Homes
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 750 Pieces
Production Hrs. Annual 2,125
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,587 1,322,098 kWh $0.07
Natural Gas $42,845 15,315 MMBtu $2.80
TOTAL ENERGY COSTS $132,432
RECOMMENDED SAVINGS* $28,612 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,698
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,368
Cost:
$16,108
$7,368 108,734 - - - - $7,368
108,734
kWh
-
-
MMBtu
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,463
Cost:
$1,660
$2,463 36,342 - - - - $2,463
36,342
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,463
Cost:
$775
$2,463 36,342 - - - - $2,463
36,342
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,151
Cost:
$1,000
- - $1,151 411 - - -
-
kWh
$1,151
411
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$755
Cost:
$940
$755 11,137 - - - - $755
11,137
kWh
-
-
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,192
Cost:
-
$1,692 - - - $(-500) - $1,692
-
kWh
-
-
MMBtu
$(-500)
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,329
Cost:
$7,575
- - $4,329 1,546 - - -
-
kWh
$4,329
1,546
MMBtu
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,749
Cost:
$15
$179 2,638 $4,570 1,632 - - $179
2,638
kWh
$4,570
1,632
MMBtu
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,221
Cost:
-
- - $1,221 436 - - -
-
kWh
$1,221
436
MMBtu
-
-
$
10: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$2,921
Cost:
$4,700
$60 879 - - $2,861 - $60
879
kWh
-
-
MMBtu
$2,861
-
$
TOTAL RECOMMENDED Savings:
$28,612
Cost:
$32,773
$14,980 196,072 $11,271 4,025 $2,361 - $14,980
196,072
kWh
$11,271
4,025
MMBtu
$2,361
-
$
TOTAL IMPLEMENTED Savings:
$8,698
Cost:
$10,290
$3,218 47,479 $5,480 1,957 - - $3,218
47,479
kWh
$5,480
1,957
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes