IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,224

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0648 # 09 Y:2024 09 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $364,878 $49,250 n/a
SD0648 # 10 Y:2024 10 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,121 $10,016 n/a
SD0648 # 11 Y:2024 11 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,340 $15,608 n/a
SD0648 # 12 Y:2024 12 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $982,749 $783,575 n/a
SD0648 # 13 Y:2024 13 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $793 $1,336 n/a
UW2319 # 01 Y:2023 01 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $56,470 $23,651 n/a
UW2319 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,837 $2,080 n/a
UW2319 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,001 $2,820 n/a
UW2319 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,443 $68,000 n/a
UW2319 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,789 $3,000 n/a
UW2319 # 06 Y:2023 06 2023 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $750,000 $871,000 n/a
UA0281 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,002 $15,154 n/a
UA0281 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,483 $47,040 n/a
UA0281 # 08 Y:2023 08 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,490 $49,464 n/a
UA0281 # 07 Y:2023 07 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,437 $26,750 n/a
UA0281 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $6,060 $1,885 n/a
UA0281 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,035 $68,083 n/a
UA0281 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,484 $8,591 n/a
UA0281 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,375 $1,000 n/a
UA0281 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,808 $5,698 n/a
UA0281 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $18,036 $12,615 n/a
MU0040 # 05 Y:2023 05 2023 PAY BILLS ON TIME TO AVOID LATE FEES $2,306 $0 n/a
MU0040 # 04 Y:2023 04 2023 MINIMIZE WATER USAGE $68,486 $150,124 n/a
MU0040 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,004 $41 n/a
MU0040 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $213 $315 n/a