Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,504
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0154 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $679 | $280 | Not Implemented |
BS0154 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,232 | $320 | Not Implemented |
BS0154 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $766 | $25 | Not Implemented |
BS0154 # 05 Y:2021 | 05 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $182,277 | $204,462 | Not Implemented |
BS0154 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,288 | $6,000 | Not Implemented |
BS0154 # 07 Y:2021 | 07 | 2021 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $893 | $710 | Not Implemented |
UD1030 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,340 | $0 | Implemented |
UD1030 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $281 | $0 | Not Implemented |
UD1030 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,468 | $4,319 | Not Implemented |
UD1030 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,026 | $340 | Implemented |
UD1030 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,569 | $35 | Not Implemented |
UD1030 # 06 Y:2021 | 06 | 2021 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,833 | $4,000 | Not Implemented |
UD1030 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,553 | $21,607 | Implemented |
UD1030 # 08 Y:2021 | 08 | 2021 | INSULATE BARE EQUIPMENT | $20,126 | $28,000 | Implemented |
UD1030 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,747 | $7,500 | Not Implemented |
NC0669 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,041 | $11,374 | n/a |
NC0669 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,266 | $40,000 | n/a |
NC0669 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $854 | $300 | n/a |
NC0669 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,310 | $30,000 | n/a |
SD0613 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,677 | $16,500 | Implemented |
SD0613 # 02 Y:2021 | 02 | 2021 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,370 | $5,000 | Implemented |
SD0613 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,201 | $1,065 | Implemented |
SD0613 # 04 Y:2021 | 04 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $590 | $1,500 | Not Implemented |
SD0613 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $218 | $2,500 | Implemented |
SU0507 # 01 Y:2021 | 01 | 2021 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,720 | $0 | Implemented |