IAC Assessment: UD1046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2022
Principal Product Truck Assembly / Painting
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales >$500,000,000
# of Employees 824
Plant Area (Sq.Ft.) 3,200,000
Annual Production 25,133 Units
Production Hrs. Annual 1,920
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,115,726 51,994,346 kWh $0.04
Electricity Demand $722,765 103,548 kW-months/year $6.98
Electricity Fees $84,020 - $ -
Natural Gas $1,491,675 288,972 MMBtu $5.16
TOTAL ENERGY COSTS $4,414,186
RECOMMENDED SAVINGS* $977,649 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $609,534
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$22,214
Cost:
$200,000
- - $22,214 3,183 - - - - - - - - - - -
-
kWh
$22,214
3,183
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,323
Cost:
-
- - - - $18,323 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$18,323
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$261,813
Cost:
$100
- - - - - - $261,813 50,252 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$261,813
50,252
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$43,076
Cost:
$3,500
$32,989 751,458 $10,087 1,445 - - - - - - - - - - $32,989
751,458
kWh
$10,087
1,445
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,795
Cost:
$3,279
$2,295 52,283 $500 72 - - - - - - - - - - $2,295
52,283
kWh
$500
72
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$30,166
Cost:
-
$23,102 526,248 $7,064 1,012 - - - - - - - - - - $23,102
526,248
kWh
$7,064
1,012
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,615
Cost:
$1,500
$(-75) (-1,702) $(-16) (-2) - - $12,706 2,439 - - - - - - $(-75)
(-1,702)
kWh
$(-16)
(-2)
kW-months/year
-
-
$
$12,706
2,439
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$27,755
Cost:
$60,000
$22,791 519,156 $4,964 712 - - - - - - - - - - $22,791
519,156
kWh
$4,964
712
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$35,495
Cost:
$1,200
$29,132 663,603 $6,363 912 - - - - - - - - - - $29,132
663,603
kWh
$6,363
912
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,940
Cost:
-
$3,294 75,037 $2,646 379 - - - - - - - - - - $3,294
75,037
kWh
$2,646
379
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,765
Cost:
$4,001
$1,734 39,501 $31 5 - - - - - - - - - - $1,734
39,501
kWh
$31
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
12: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,614
Cost:
$5,220
$1,614 36,759 - - - - - - - - - - - - $1,614
36,759
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
13: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$127,137
Cost:
$75,000
$(-426) (-9,698) $(-1,249) (-180) - - - - - - $92,300 - $36,512 - $(-426)
(-9,698)
kWh
$(-1,249)
(-180)
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$92,300
-
$
$36,512
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$386,941
Cost:
$554,028
$245,633 5,596,561 $53,512 7,667 - - - - $69,900 - $17,896 - - - $245,633
5,596,561
kWh
$53,512
7,667
kW-months/year
-
-
$
-
-
MMBtu
$69,900
-
$
$17,896
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$977,649
Cost:
$907,828
$362,083 8,249,206 $106,116 15,204 $18,323 - $274,519 52,691 $69,900 - $110,196 - $36,512 - $362,083
8,249,206
kWh
$106,116
15,204
kW-months/year
$18,323
-
$
$274,519
52,691
MMBtu
$69,900
-
$
$110,196
-
$
$36,512
-
$
TOTAL IMPLEMENTED Savings:
$609,534
Cost:
$832,528
$301,298 6,864,569 $91,628 13,127 - - - - $69,900 - $110,196 - $36,512 - $301,298
6,864,569
kWh
$91,628
13,127
kW-months/year
-
-
$
-
-
MMBtu
$69,900
-
$
$110,196
-
$
$36,512
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Raw Material Ancillary Material Cost