Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
385
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0209 # 07 Y:2018 | 07 | 2018 | LEASE EQUIPMENT INSTEAD OF PURCHASING | $3,120 | $0 | Not Implemented |
TT0209 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,604 | $3,500 | Not Implemented |
TT0209 # 05 Y:2018 | 05 | 2018 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,157 | $0 | Not Implemented |
TT0209 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $6,114 | $5,200 | Not Implemented |
TT0209 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,088 | $2,000 | Implemented |
TT0209 # 02 Y:2018 | 02 | 2018 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $13,850 | $17,000 | Not Implemented |
TT0209 # 01 Y:2018 | 01 | 2018 | CLEAN CONDENSER TUBES | $14,316 | $600 | Implemented |
TT0205 # 08 Y:2018 | 08 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,176 | $6,900 | Not Implemented |
TT0205 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,761 | $8,362 | Not Implemented |
TT0205 # 06 Y:2018 | 06 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $9,911 | $10,800 | Not Implemented |
TT0205 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,941 | $160 | Not Implemented |
TT0205 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $28,188 | $132,000 | Not Implemented |
TT0205 # 03 Y:2018 | 03 | 2018 | METER WASTE WATER | $30,463 | $1,000 | Not Implemented |
TT0205 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $376,439 | $1,600 | Not Implemented |
TT0205 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $376,439 | $20 | Implemented |
TT0206 # 03 Y:2018 | 03 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $428 | $150 | Not Implemented |
TT0206 # 02 Y:2018 | 02 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $6,182 | $25 | Not Implemented |
TT0206 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,406 | $32,616 | Not Implemented |
TT0196 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,539 | $1,150 | Not Implemented |
TT0196 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,985 | $31 | Not Implemented |
TT0196 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $5,438 | $19,250 | Not Implemented |
TT0196 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,605 | $3,050 | Implemented |
TT0196 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $36,417 | $148,815 | Not Implemented |
TT0175 # 09 Y:2016 | 09 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,155 | $200 | Implemented |
TT0175 # 08 Y:2016 | 08 | 2016 | USE OPTIMUM THICKNESS INSULATION | $1,726 | $375 | Not Implemented |