IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,504

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0597 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,822 $17,000 Not Implemented
SD0597 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,897 $3,900 Not Implemented
SD0597 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,547 $225 Implemented
SD0597 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,307 $5,611 Not Implemented
SD0597 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $691 $1,720 Not Implemented
GT0947 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,436 $325 Implemented
GT0947 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $606 $250 Not Implemented
GT0947 # 03 Y:2020 03 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,554 $800 Not Implemented
GT0947 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $1,921 $2,060 Not Implemented
GT0947 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,659 $4,515 Implemented
GT0947 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $7,365 $52,257 Not Implemented
OK1026 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,058 $31,918 Implemented
OK1026 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,777 $4,050 Not Implemented
OK1026 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,340 $8,098 Not Implemented
OK1026 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,503 $1,186 Implemented
OK1026 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,712 $0 Implemented
OK1026 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,762 $490 Implemented
OK1026 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,974 $0 Implemented
OK1026 # 08 Y:2020 08 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,239 $795 Implemented
UA0224 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,443 $2,681 Not Implemented
UA0224 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,645 $50 Not Implemented
UA0224 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,994 $9,795 Not Implemented
UA0224 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,259 $16,524 Not Implemented
UA0224 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,983 $20,013 Not Implemented
UA0224 # 06 Y:2020 06 2020 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,503 $12,612 Not Implemented