IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0054 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,752 $0 n/a
UU0053 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,354 $4,100 Not Implemented
UU0053 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,131 $55 Not Implemented
UU0053 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,710 $2,000 Not Implemented
UU0053 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,112 $70,635 Not Implemented
UU0053 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,869 $2,340 Implemented
UU0053 # 06 Y:2003 06 2003 INSTALL TURBULATORS $2,610 $1,572 Not Implemented
UU0051 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,232 $0 Not Implemented
UU0051 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $340 Not Implemented
UU0051 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,845 $961 Not Implemented
UU0051 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,130 $11,800 Not Implemented
UU0051 # 05 Y:2003 05 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,823 $0 Not Implemented
UU0051 # 06 Y:2003 06 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,510 $5,980 Not Implemented
UU0051 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,270 $8,450 Not Implemented
UU0050 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,216 $5,500 Not Implemented
UU0050 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,838 $2,000 Not Implemented
UU0050 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $4,342 Not Implemented
UU0050 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,075 $420 Not Implemented
UU0050 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $177 $390 Not Implemented
UU0050 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,400 $0 Not Implemented
UU0050 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,684 $895 Not Implemented
UU0050 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $5,144 $9,200 Not Implemented
UU0009 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,515 $19,380 Implemented
UU0009 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,476 $18,287 Implemented
UU0009 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,538 $1,000 Implemented