Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0281 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $6,060 $1,885 n/a
UA0281 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,483 $47,040 n/a
UA0281 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,808 $5,698 n/a
UA0281 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,375 $1,000 n/a
UA0281 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,035 $68,083 n/a
UA0281 # 07 Y:2023 07 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,437 $26,750 n/a
UA0281 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $18,036 $12,615 n/a
UA0281 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,484 $8,591 n/a
UA0281 # 08 Y:2023 08 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,490 $49,464 n/a
UA0281 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,002 $15,154 n/a
UA0268 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,089 $17,628 Not Implemented
UA0268 # 07 Y:2022 07 2022 USE RADIANT HEATER FOR SPOT HEATING $18,030 $20,167 Not Implemented
UA0268 # 08 Y:2022 08 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $418 $1,048 Not Implemented
UA0268 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,641 $9,092 Not Implemented
UA0268 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,836 $1,190 Not Implemented
UA0268 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,807 $1,000 Not Implemented
UA0268 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,098 $8,397 Not Implemented
UA0268 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $668 $557 Not Implemented
UA0262 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,104 $4,929 Implemented
UA0262 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,699 $2,060 Implemented
UA0262 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,910 $400 Not Implemented
UA0262 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,023 $44,464 Implemented
UA0258 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,325 $2,961 Not Implemented
UA0258 # 03 Y:2022 03 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,610 $7,484 Not Implemented
UA0258 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,324 $2,000 Implemented