IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0146 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,620 $0 Implemented
UD0146 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $598 $210 Implemented
UD0142 # 02 Y:1984 02 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,060 $10,000 Implemented
UD0142 # 01 Y:1984 01 1984 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $28,921 $935 Implemented
UD0142 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,810 $384 Implemented
GT0227 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,015 $216 Implemented
UD0139 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $530 Implemented
UD0139 # 05 Y:1984 05 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,736 $15,100 Implemented
UD0139 # 04 Y:1984 04 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,318 $0 Implemented
UD0139 # 01 Y:1984 01 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,912 $510 Implemented
GT0234 # 03 Y:1984 03 1984 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,500 $20,000 Not Implemented
GT0234 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $386 Implemented
GT0234 # 01 Y:1984 01 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,550 $30,000 Implemented
GT0227 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $850 $2,858 Implemented
GT0227 # 04 Y:1984 04 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $193 $10,600 Implemented
GT0227 # 02 Y:1984 02 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,520 $1,000 Not Implemented
GT0227 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $470 $300 Not Implemented
CO0010 # 11 Y:1984 11 1984 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $6,677 $5,000 Not Implemented
CO0010 # 09 Y:1984 09 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $186 $175 Implemented
CO0010 # 08 Y:1984 08 1984 UPGRADE OBSOLETE EQUIPMENT $318 $30 Implemented
CO0010 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $165 $200 Implemented
CO0010 # 06 Y:1984 06 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $372 $800 Implemented
CO0010 # 05 Y:1984 05 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $543 $493 Not Implemented
CO0010 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $182 $68 Implemented
CO0010 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,168 $6,000 Not Implemented