IAC logo
IAC Assessment: UD0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product AIRCRAFT PROPELLERS
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 282
Plant Area (Sq.Ft.) 0
Annual Production 2,880 Pieces
Production Hrs. Annual 0
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,950 4,089,977 kWh $0.05
Natural Gas $109,634 20,079 MMBtu $5.46
TOTAL ENERGY COSTS $307,584
RECOMMENDED SAVINGS* $20,499 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,499
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$3,912
Cost:
$510
$3,712 111,665 - - $200 - $3,712
111,665
kWh
-
-
MMBtu
$200
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,450
Cost:
$62
$385 11,723 $3,065 568 - - $385
11,723
kWh
$3,065
568
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,083
Cost:
$530
$1,373 23,740 $(-290) (-54) - - $1,373
23,740
kWh
$(-290)
(-54)
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,318
Cost:
-
$4,318 - - - - - $4,318
-
kWh
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,736
Cost:
$15,100
$14,862 290,152 $(-7,126) (-1,320) - - $14,862
290,152
kWh
$(-7,126)
(-1,320)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$20,499
Cost:
$16,202
$24,650 437,280 $(-4,351) (-806) $200 - $24,650
437,280
kWh
$(-4,351)
(-806)
MMBtu
$200
-
$
TOTAL IMPLEMENTED Savings:
$20,499
Cost:
$16,202
$24,650 437,280 $(-4,351) (-806) $200 - $24,650
437,280
kWh
$(-4,351)
(-806)
MMBtu
$200
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes